← Briefs
Water & SanitationOpen
Fix Urban Water Supply in One Nigerian City
Lagos Water Corporation serves 9 million people but reliably delivers water to fewer than 2 million. Design the operational turnaround that changes this for one defined service area.
Closes 10 Sept 2026
The brief
Urban water utilities in Nigeria are among the worst-performing in Africa. They produce water but lose over 50% to non-revenue water (leakage and theft). They have billing systems that collect a fraction of what is owed. They lack the metering data to target maintenance. And they face chronic underfunding from state governments that have politically committed to low water tariffs. The result is that most urban Nigerians buy water from private vendors at 10 to 20 times the piped water tariff.
Your challenge is to design an operational turnaround plan for one defined service area of an urban water utility in Nigeria (you may use Lagos, Kano, Enugu, or any state capital as your reference). The plan must reduce non-revenue water by at least 30%, increase revenue collection from connected households by 50%, and improve reliable supply hours per day from the current average (typically 2 to 6 hours) to at least 16 hours, within 24 months.
Submit a turnaround design document (max 12 pages) including: the specific interventions for non-revenue water reduction, the billing and collection improvement, the operational changes needed to extend supply hours, the investment required, the tariff model, stakeholder management for political challenges, and 24-month milestones.
Judging criteria: 40% technical credibility of NRW and supply improvement design, 30% revenue collection improvement, 20% tariff and political economy management, 10% investment model.